Kurdish Coffee (Qazwan) Production Line and Factory Setup
A Kurdish coffee (Qazwan) production line is an integrated industrial system designed to roast and grind the naturally caffeine-free fruits of the Pistacia atlantica tree (Qazwan / Beneh) harvested from the mountains of Kurdistan. The line produces traditional Kurdish coffee with its characteristic oily mouthfeel and pistachio-like notes.
From an industrial perspective, Kurdish coffee processing is important because it combines controlled high-temperature roasting of the unique Qazwan fruits, precise grinding and protective packaging to preserve the distinctive aroma and texture. The process relies on a defined sequence of unit operations that must be correctly engineered and integrated.
Primary raw materials typically include dried Qazwan (Pistacia atlantica) fruits. Core machinery consists of coffee roasters (capacity from 300 g to 15 kg, temperature up to 300 °C), adjustable grinders and packaging machines.
The Industrial Department supports investors establishing a new Kurdish coffee factory as well as existing plant owners requiring repair, overhaul, capacity expansion or automation of current roasting lines. Projects can start from an empty site or from an operating facility that needs technical upgrading.
Whether the goal is a green-field turnkey Kurdish coffee plant in Iraq, Kurdistan Region, Afghanistan or other regional markets, or the modernization of an existing line in Iran, engineering, machinery supply or manufacturing, installation, commissioning and ongoing technical support can be provided under defined contractual scopes.
Production Line Overview
The Kurdish coffee production line is engineered as an integrated process system covering roasting of dried Qazwan fruits, grinding and packaging. Design capacity is determined during the engineering phase and can typically range from 300–650 kg/day depending on final product mix and market requirements.
Product types include pure Qazwan coffee and blended variants (with almond, hazelnut, pistachio and musk notes). The overall process flow follows a defined sequence: roasting of dried fruits, grinding to the desired particle size and packaging.
Main machinery groups include coffee roasters (300 g–15 kg capacity, up to 300 °C), adjustable grinders and packaging equipment. Supporting infrastructure covers electrical power, gas and process water.
Manpower requirements depend on the degree of automation. Quality control covers roast level, particle size and packaging integrity. Finished coffee is stored under conditions that protect aroma before distribution.
Technical Specifications
The following technical data represent typical ranges for an industrial Kurdish coffee production line. Final values are defined during basic and detailed engineering and may vary according to selected technology, level of automation, product portfolio and factory layout. For precise project-specific figures, contact the Industrial Department.
| Specification | Description |
|---|---|
| Product | Kurdish coffee / Qazwan (pure and blended variants) |
| Production Capacity | 300–650 kg/day (depending on project capacity and selected equipment sizing) |
| Required Area | 200–500 m² (subject to final layout and capacity) |
| Electrical Power | 380 V three-phase, 30–80 kW (depending on equipment selection and automation level) |
| Gas | 50–100 m³/h |
| Water Consumption | 5–10 m³/day |
| Manpower | 3–8 persons per shift (depending on automation level) |
| Main Machines | Coffee roaster (300 g–15 kg, up to 300 °C), adjustable grinder, packaging machine |
| Roasting Parameters | Temperature up to 300 °C, typical time 9–15 minutes (subject to final process definition) |
All figures are indicative. Detailed utility balances, equipment lists and layout drawings are prepared after process definition and capacity confirmation.
Products
An industrial Kurdish coffee production line can manufacture a variety of finished products depending on the selected roast and blend configuration. Typical product families include:
- Pure Qazwan coffee
- Qazwan with almond notes
- Qazwan with hazelnut notes
- Qazwan with pistachio and musk notes
- Retail and bulk packaging formats
Variant development (roast level, grind size, blend composition, packaging) is defined during product development and process engineering according to target markets.
Raw Materials for Kurdish Coffee Factory
Raw material selection and quality control are critical for final aroma and texture. The main materials used are described below.
Main Raw Materials
- Dried Qazwan fruits (Pistacia atlantica) – Harvested from the mountains of Kurdistan (Zibar, Shiladze, Barzan regions). Naturally caffeine-free. Quality of incoming fruits (moisture, cleanliness) directly influences roast result.
Secondary / Optional Materials
- Packaging materials
Storage and handling conditions (cool, dry, pest-controlled) must be maintained to preserve fruit quality before roasting.
Sahi Rasa For Factories raw material
The Supply Chain Department is prepared to support identification, evaluation and supply of the main and auxiliary raw materials required by Kurdish coffee factories. Depending on the contractual scope, services may include supplier identification and evaluation, procurement and purchase coordination, specification control, logistics coordination, supply-chain design for continuous production, ongoing supply arrangements, and supply of materials from Iran for projects located in regional markets.
Registering an order for raw materials for the factory Kurdish Coffee (Qazwan)
Sahi Rasa Supply Chain Department
Raw-material supply chain support can be examined for industrial projects located in Iran, Iraq, the Kurdistan Region of Iraq (including Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Manufacturing Process
The industrial Kurdish coffee process follows a defined sequence of unit operations.
- Roasting – Dried Qazwan fruits are roasted in a dedicated roaster at temperatures up to 300 °C for typically 9–15 minutes to develop the desired color and flavor.
- Grinding – Roasted fruits are ground to the target particle size with an adjustable grinder.
- Packaging – Finished Kurdish coffee is packed into retail or bulk containers.
Machinery & Equipment
Each main machine performs a specific function. Support is available for design, manufacturing or procurement, customization, installation, commissioning, repair, overhaul, refurbishment, automation and spare-parts supply according to the agreed project scope.
- Coffee Roaster – Roasts Qazwan fruits under controlled temperature (up to 300 °C) and time. Capacity range typically 300 g to 15 kg. Core machine that defines flavor profile. Position: first process stage. Quality impact: temperature profile and residence time control aroma development. Maintenance: burners, drums, temperature sensors and cooling system. Sahi Rasa support covers design, manufacturing/procurement, installation, repair and spare parts.
- Adjustable Grinder – Grinds roasted fruits to the desired particle size. Position: after roasting. Quality impact: grind size distribution affects extraction and mouthfeel. Maintenance: grinding elements, bearings and screens. Sahi Rasa provides specialized grinder support and overhaul.
- Packaging Machine – Packs finished coffee. Position: end of line. Quality impact: pack integrity and aroma protection. Maintenance: sealing heads and film systems.
Factory Layout & Building Requirements
Typical functional areas include raw-fruit receiving and storage, roasting and grinding hall, packaging, finished-goods warehouse, quality-control laboratory, utility rooms (gas), maintenance workshop, staff facilities and loading docks. Layout must respect hygienic zoning, heat and smoke extraction from the roaster and process flow. Exact area allocation is determined during the engineering phase according to capacity and product range.
Utilities
- Electricity: 380 V three-phase, typically 30–80 kW
- Gas: 50–100 m³/h
- Water: 5–10 m³/day
- Exhaust systems for the roaster
- HVAC and drainage according to hygiene and local regulations
Turnkey Factory Setup
An investor can start from an empty site. Depending on contractual scope, the project can be accompanied through: Idea → Feasibility → Engineering → Factory Design → Machinery → Procurement → Manufacturing → Installation → Commissioning → Training → Raw Material Supply → Packaging → Trial Production → Commercial Production. The objective is an operational factory ready for production.
EPC & PMC
Projects can be executed under EPC (Engineering, Procurement, Construction) or PMC (Project Management Consultancy) approaches. Engineering, machinery supply or manufacturing, installation supervision and commissioning are coordinated within the defined contract boundaries.
Machinery Repair
Existing Kurdish coffee factories can request inspection, troubleshooting, mechanical and electrical repair, component replacement, spare-parts supply and line maintenance support for roasters, grinders and packaging machines.
Machinery Overhaul & Refurbishment
Older equipment can be evaluated for comprehensive overhaul, replacement of worn drums and burners, control-system upgrades, improved reliability and modest capacity or quality improvements where technically feasible.
Capacity Expansion
Capacity of an existing line can often be increased by addressing bottlenecks, upgrading key machines (roaster, grinder, packaging), improving material handling or introducing selective automation.
Industrial Automation
Typical applications include PLC sequence control, roast-profile monitoring, automatic dosing, HMI, data logging and optional SCADA integration.
Supply Chain
Factory = Machinery + Raw Materials + Utilities + People + Process + Supply Chain + Market. The Supply Chain Department supports supplier sourcing, procurement, logistics and ongoing material supply for Kurdish coffee projects.
Packaging
Primary packaging, secondary packaging, labeling, coding, cartoning and palletizing are integrated according to product format and market requirements.
Branding & Product Development
When required, support can be provided for product development, packaging design, graphic design, industrial design, branding and related marketing preparation.
Market & Country Sections
Engineering, machinery, installation, overhaul and supply-chain support are available for Kurdish coffee projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Sahi Rasa Services
| Service | Application in This Project |
|---|---|
| Feasibility Study | Technical and economic assessment of capacity, product mix and investment |
| Factory Design | Layout, process flow and utility design |
| Machinery Design / Manufacturing | Specification and coordinated supply or manufacturing of process equipment |
| Procurement | Sourcing of machinery, components and materials |
| Installation & Commissioning | Mechanical/electrical installation, start-up and performance testing |
| Automation | PLC, HMI, process control and optional SCADA |
| Raw Material Supply | Coordination via Supply Chain Department |
| Repair / Overhaul / Refurbishment | Restoration and modernization of existing machinery |
| Capacity Expansion | Engineering and implementation of throughput increases |
| Staff Training | Operational and basic maintenance training |
Why Sahi Rasa
Process engineering, machinery-related capabilities, procurement support, supply-chain coordination, installation, commissioning, training, maintenance support and automation are combined. The practical advantage is a more integrated execution path from concept to an operating production line.
From Empty Land to Production
Typical sequence: Feasibility → Engineering → Factory Design → Equipment Design → Machinery Manufacturing/Procurement → Logistics → Installation → Commissioning → Staff Training → Raw Material Supply → Trial Production → Commercial Production. Operational support for a defined initial period can be examined as a contractual option.
Who Should Contact Sahi Rasa?
- Investors – planning a new Kurdish coffee (Qazwan) factory or production line
- Existing Factory Owners – needing repair, overhaul, refurbishment, modernization, automation or capacity expansion
- Industrial Buyers – requiring machinery, spare parts, raw materials or engineering services
Final CTA
If you intend to set up a Kurdish coffee (Qazwan) production line or factory, if your existing plant needs repair, overhaul or capacity expansion, if you require new machinery or automation, or if you need coordination of raw-material supply, contact the Industrial Department.
Submit your request for: Factory Setup / Machinery / Repair / Overhaul / Refurbishment / Automation / Capacity Expansion / Raw Materials.
Registering an order for raw materials for the factory Kurdish Coffee (Qazwan)
FAQ
- What is the typical cost of setting up a Kurdish coffee factory?
Cost depends on capacity, product range, automation level, building and utility scope. A detailed estimate is prepared after process definition. Indicative setup cost around 130 thousand USD may be examined during feasibility. - Which main machines are required?
Coffee roaster (300 g–15 kg, up to 300 °C), adjustable grinder and packaging machine. - What production capacity can be designed?
Typical capacity ranges from 300 to 650 kg/day, determined during the engineering phase. - How much space is needed?
Typical process area ranges from approximately 200 to 500 m², subject to final layout. - What are the main raw materials?
Dried Qazwan (Pistacia atlantica) fruits and packaging materials. - Can raw materials be supplied?
Yes, via the Supply Chain Department according to project scope. - Is machinery manufacturing or procurement supported?
Design, manufacturing or coordinated procurement according to the agreed scope. - Can existing machines be repaired?
Yes – inspection, troubleshooting, mechanical/electrical repair and spare parts. - Is overhaul or refurbishment possible?
Yes – comprehensive restoration and control upgrades. - Can capacity of an existing line be increased?
Often yes, by addressing bottlenecks and upgrading key equipment. - Are turnkey projects executed?
Turnkey or partial turnkey scopes can be offered under defined contracts. - Are services available in Iraq and Kurdistan Region?
Yes, including Erbil, Sulaymaniyah, Duhok and other locations. - Are services available in Afghanistan?
Yes, including Kabul, Herat and Mazar-e-Sharif. - Can raw materials be supplied from Iran for regional projects?
Yes, coordination of material supply is part of possible supply-chain scope. - Is installation and commissioning included?
They can be included according to the selected contractual package.