Portfolio
Toilet (One-Piece and Smart) Production Line and Factory Setup
A toilet production line is an integrated industrial system designed to form ceramic toilet bodies by high-pressure casting, glaze, dry, fire, assemble electro-mechanical modules for smart models, perform functional tests and package the finished product. The line produces conventional and smart one-piece toilets with high dimensional accuracy and reliability.
From an industrial perspective, toilet manufacturing is important because it combines high-pressure casting (typically COMPACTCAST CC300 at 19.5 bar), robotic glazing, controlled drying, tunnel firing, SMT electronics assembly for smart models and rigorous functional testing (flushing, leakage, durability ≥50 000 cycles). The process relies on a defined sequence of unit operations that must be correctly engineered and integrated.
Primary raw materials typically include clay, kaolin, feldspar, silica, glaze, pigments and electro-mechanical components for smart models. Core machinery consists of high-pressure casting systems (rim, siphon and skirt stations), 6-axis robotic glazing systems, microwave drying tunnels, laser scanners for defect detection, SMT lines for electronics and functional test stations. Typical casting capacity 250–350 toilets per day.
The Industrial Department supports investors establishing a new toilet factory as well as existing plant owners requiring repair, overhaul, capacity expansion or automation of current lines. Projects can start from an empty site or from an operating facility that needs technical upgrading.
Whether the goal is a green-field turnkey toilet plant in Iraq, Kurdistan Region, Afghanistan or other regional markets, or the modernization of an existing line in Iran, engineering, machinery supply or manufacturing, installation, commissioning and ongoing technical support can be provided under defined contractual scopes.
Production Line Overview
The toilet production line is engineered as an integrated process system covering body casting, robotic glazing, microwave drying, optional smart-module assembly, functional testing and packaging. Design capacity is determined during the engineering phase; typical casting output is 250–350 toilets per day.
Product types include conventional one-piece toilets and smart toilets with electro-mechanical modules. The overall process flow follows a defined sequence: high-pressure casting of rim, siphon and skirt, robotic glazing, microwave drying, laser defect scanning, assembly of smart modules (if required), functional testing (flushing pressure 0.05–0.8 MPa, leakage and durability) and packaging.
Main machinery groups include high-pressure casting systems, robotic glazing systems, microwave drying tunnels, laser scanners, SMT lines and functional test stations. Supporting infrastructure covers electrical power, gas and process water.
Manpower requirements depend on the degree of automation. Quality control covers dimensional accuracy, surface quality, functional performance and packaging integrity. Finished toilets are stored under protected conditions before distribution.
Technical Specifications
The following technical data represent typical ranges for an industrial toilet production line. Final values are defined during basic and detailed engineering and may vary according to selected technology, level of automation, product portfolio and factory layout. For precise project-specific figures, contact the Industrial Department.
| Specification | Description |
|---|---|
| Product | One-piece and smart toilets |
| Production Capacity | Casting capacity typically 250–350 toilets/day (depending on project design) |
| Required Area | 1000–3000 m² (subject to final layout and capacity) |
| Electrical Power | 380 V three-phase, 150–400 kW (depending on equipment selection and automation level) |
| Gas | 500–1500 m³/h |
| Water Consumption | 20–50 m³/day |
| Manpower | 15–30 persons per shift (depending on automation level) |
| Main Machines | High-pressure casting system (COMPACTCAST CC300, 19.5 bar), 6-axis RobotGlaze, microwave drying tunnel, laser scanner, SMT line, functional test station |
All figures are indicative. Detailed utility balances, equipment lists and layout drawings are prepared after process definition and capacity confirmation.
Products
An industrial toilet production line can manufacture conventional one-piece toilets and smart toilets with electro-mechanical modules, various designs and glaze finishes according to market requirements.
Raw Materials for Toilet Factory
Raw material selection and quality control are critical for casting, firing and functional reliability. The main materials used are described below.
Main Raw Materials
- Clay, kaolin, feldspar, silica – Form the ceramic body.
- Glaze, pigments – Provide surface finish.
- Electro-mechanical components – For smart models (hydraulic systems, electronic boards, control panels).
Secondary / Optional Materials
- Packaging materials
Storage and handling conditions must be controlled to preserve material consistency.
Sahi Rasa For Factories raw material
The Supply Chain Department is prepared to support identification, evaluation and supply of the main and auxiliary raw materials required by toilet factories. Depending on the contractual scope, services may include supplier identification and evaluation, procurement and purchase coordination, specification control, logistics coordination, supply-chain design for continuous production, ongoing supply arrangements, and supply of materials from Iran for projects located in regional markets.
Registering an order for raw materials for the factory Toilet
Sahi Rasa Supply Chain Department
Raw-material supply chain support can be examined for industrial projects located in Iran, Iraq, the Kurdistan Region of Iraq (including Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Manufacturing Process
The industrial toilet process follows a defined sequence of unit operations.
- High-Pressure Casting – Ceramic body is formed using COMPACTCAST CC300 (rim, siphon and skirt stations) at 19.5 bar; typical output 250–350 toilets/day.
- Robotic Glazing – 6-axis robots apply glaze.
- Microwave Drying – Controlled drying with ±2 °C temperature accuracy.
- Defect Scanning – Laser scanners and AI vision systems identify defective bodies.
- Smart Module Assembly (if required) – Electro-mechanical modules including hydraulic system, SMT electronic board (0.025 µm precision) and control panel are assembled.
- Functional Testing – Flushing (0.05–0.8 MPa), leakage and durability (≥50 000 cycles) tests are performed.
- Packaging – Finished toilets are packaged.
Machinery & Equipment
Each main machine performs a specific function. Support is available for design, manufacturing or procurement, customization, installation, commissioning, repair, overhaul, refurbishment, automation and spare-parts supply according to the agreed project scope.
- High-Pressure Casting System (COMPACTCAST CC300) – Forms the ceramic body. Core machine for dimensional accuracy. Position: first stage. Quality impact: pressure and mold quality determine body integrity. Maintenance: molds, pumps and seals. Sahi Rasa provides specialized casting support and overhaul.
- 6-Axis RobotGlaze – Applies glaze uniformly. Position: after casting. Quality impact: glaze coverage and thickness. Maintenance: robots, nozzles and vision systems.
- Microwave Drying Tunnel – Removes moisture under precise control. Position: after glazing. Quality impact: prevents cracking. Maintenance: generators and conveyors.
- Laser Scanner and AI Vision – Detects defects. Position: after drying. Importance: quality gate. Maintenance: optical systems.
- SMT Line and Functional Test Station – Assemble and test smart modules. Position: for smart models. Quality impact: electronic reliability and functional performance. Maintenance: SMT equipment and test fixtures.
Factory Layout & Building Requirements
Typical functional areas include raw-material storage, casting hall, glazing and drying, smart-module assembly (if applicable), testing, packaging, finished-goods warehouse, quality-control laboratory, utility rooms, maintenance workshop, staff facilities and loading docks. Layout must respect process flow and clean-room conditions for electronics when smart models are produced. Exact area allocation is determined during the engineering phase according to capacity and product range.
Utilities
- Electricity: 380 V three-phase, typically 150–400 kW
- Gas: 500–1500 m³/h
- Water: 20–50 m³/day
- HVAC and drainage according to hygiene and local regulations
Turnkey Factory Setup
An investor can start from an empty site. Depending on contractual scope, the project can be accompanied through: Idea → Feasibility → Engineering → Factory Design → Machinery → Procurement → Manufacturing → Installation → Commissioning → Training → Raw Material Supply → Packaging → Trial Production → Commercial Production. The objective is an operational factory ready for production.
EPC & PMC
Projects can be executed under EPC (Engineering, Procurement, Construction) or PMC (Project Management Consultancy) approaches. Engineering, machinery supply or manufacturing, installation supervision and commissioning are coordinated within the defined contract boundaries.
Machinery Repair
Existing toilet factories can request inspection, troubleshooting, mechanical and electrical repair, component replacement, spare-parts supply and line maintenance support for casting systems, robots, kilns, electronics assembly and test stations.
Machinery Overhaul & Refurbishment
Older equipment can be evaluated for comprehensive overhaul, replacement of worn molds and refractories, control-system upgrades, improved reliability and modest capacity or quality improvements where technically feasible.
Capacity Expansion
Capacity of an existing line can often be increased by adding casting stations, upgrading test capacity or introducing selective automation.
Industrial Automation
Typical applications include PLC sequence control, robotic programming, automatic testing, HMI, data logging and optional SCADA integration.
Supply Chain
Factory = Machinery + Raw Materials + Utilities + People + Process + Supply Chain + Market. The Supply Chain Department supports supplier sourcing, procurement, logistics and ongoing material supply for toilet projects.
Packaging
Protective packaging, secondary packaging, labeling, coding and palletizing are integrated according to product format and market requirements.
Branding & Product Development
When required, support can be provided for product development, packaging design, graphic design, industrial design, branding and related marketing preparation.
Market & Country Sections
Engineering, machinery, installation, overhaul and supply-chain support are available for toilet projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Sahi Rasa Services
| Service | Application in This Project |
|---|---|
| Feasibility Study | Technical and economic assessment of capacity, product mix and investment |
| Factory Design | Layout, process flow and utility design |
| Machinery Design / Manufacturing | Specification and coordinated supply or manufacturing of process equipment |
| Procurement | Sourcing of machinery, components and materials |
| Installation & Commissioning | Mechanical/electrical installation, start-up and performance testing |
| Automation | PLC, HMI, process control and optional SCADA |
| Raw Material Supply | Coordination via Supply Chain Department |
| Repair / Overhaul / Refurbishment | Restoration and modernization of existing machinery |
| Capacity Expansion | Engineering and implementation of throughput increases |
| Staff Training | Operational and basic maintenance training |
Why Sahi Rasa
Process engineering, machinery-related capabilities, procurement support, supply-chain coordination, installation, commissioning, training, maintenance support and automation are combined. The practical advantage is a more integrated execution path from concept to an operating production line.
From Empty Land to Production
Typical sequence: Feasibility → Engineering → Factory Design → Equipment Design → Machinery Manufacturing/Procurement → Logistics → Installation → Commissioning → Staff Training → Raw Material Supply → Trial Production → Commercial Production. Operational support for a defined initial period can be examined as a contractual option.
Who Should Contact Sahi Rasa?
- Investors – planning a new toilet factory or production line
- Existing Factory Owners – needing repair, overhaul, refurbishment, modernization, automation or capacity expansion
- Industrial Buyers – requiring machinery, spare parts, raw materials or engineering services
Final CTA
If you intend to set up a toilet (one-piece or smart) production line or factory, if your existing plant needs repair, overhaul or capacity expansion, if you require new machinery or automation, or if you need coordination of raw-material supply, contact the Industrial Department.
Submit your request for: Factory Setup / Machinery / Repair / Overhaul / Refurbishment / Automation / Capacity Expansion / Raw Materials.
Registering an order for raw materials for the factory Toilet
FAQ
- What is the typical cost of setting up a toilet factory?
Cost depends on capacity, product range, automation level, building and utility scope. A detailed estimate is prepared after process definition. - Which main machines are required?
High-pressure casting system, robotic glazing system, microwave drying tunnel, laser scanner, SMT line (for smart models) and functional test station. - What production capacity can be designed?
Typical casting capacity 250–350 toilets/day, determined during the engineering phase. - How much space is needed?
Typical process area ranges from approximately 1000 to 3000 m², subject to final layout. - What are the main raw materials?
Clay, kaolin, feldspar, silica, glaze, pigments, electro-mechanical components (for smart models) and packaging materials. - Can raw materials be supplied?
Yes, via the Supply Chain Department according to project scope. - Is machinery manufacturing or procurement supported?
Design, manufacturing or coordinated procurement according to the agreed scope. - Can existing machines be repaired?
Yes – inspection, troubleshooting, mechanical/electrical repair and spare parts. - Is overhaul or refurbishment possible?
Yes – comprehensive restoration and control upgrades. - Can capacity of an existing line be increased?
Often yes, by adding casting stations or upgrading test capacity. - Are turnkey projects executed?
Turnkey or partial turnkey scopes can be offered under defined contracts. - Are services available in Iraq and Kurdistan Region?
Yes, including Erbil, Sulaymaniyah, Duhok and other locations. - Are services available in Afghanistan?
Yes, including Kabul, Herat and Mazar-e-Sharif. - Can raw materials be supplied from Iran for regional projects?
Yes, coordination of material supply is part of possible supply-chain scope. - Is installation and commissioning included?
They can be included according to the selected contractual package.