Portfolio
Paint and Thinner Production Line and Factory Setup
A paint and thinner production line is an integrated industrial system designed to mix resins, solvents, pigments and additives in a high-speed mixer, mill pigments for fine dispersion, filter, adjust viscosity and fill the finished product into cans. The line produces decorative and industrial paints as well as thinners.
From an industrial perspective, paint manufacturing is important because it combines precise weighing, high-speed mixing, efficient pigment dispersion in sand or ball mills, filtration and accurate filling (2000–5000 cans/h) to achieve consistent color, viscosity and shelf life. Typical capacity ranges from 5 to 20 tons/day.
Primary raw materials typically include resins, solvents, pigments, additives, water and thinner components. Core machinery consists of high-speed mixers, sand or ball mills, color tanks, filling machines (2000–5000 cans/h), capping machines and labeling machines.
The Industrial Department supports investors establishing a new paint factory as well as existing plant owners requiring repair, overhaul, capacity expansion or automation of current lines. Projects can start from an empty site or from an operating facility that needs technical upgrading.
Whether the goal is a green-field turnkey paint plant in Iraq, Kurdistan Region, Afghanistan or other regional markets, or the modernization of an existing line in Iran, engineering, machinery supply or manufacturing, installation, commissioning and ongoing technical support can be provided under defined contractual scopes.
Production Line Overview
The paint and thinner production line is engineered as an integrated process system covering raw-material preparation, high-speed mixing, milling, filtration, viscosity adjustment, filling, capping and labeling. Design capacity is determined during the engineering phase and can typically range from 5 to 20 tons/day depending on final product mix and market requirements.
Product types include decorative paints, industrial paints and thinners. The overall process flow follows a defined sequence: raw-material preparation and weighing, high-speed mixing, milling for pigment dispersion, filtration, viscosity adjustment, filling into cans (2000–5000 cans/h), capping and labeling.
Main machinery groups include high-speed mixers, sand or ball mills, color tanks, filling machines, capping machines and labeling machines. Supporting infrastructure covers electrical power and process water.
Manpower requirements depend on the degree of automation. Quality control covers color, viscosity, fineness of grind and packaging integrity. Finished product is stored under controlled conditions before distribution.
Technical Specifications
The following technical data represent typical ranges for an industrial paint and thinner production line. Final values are defined during basic and detailed engineering and may vary according to selected technology, level of automation, product portfolio and factory layout. For precise project-specific figures, contact the Industrial Department.
| Specification | Description |
|---|---|
| Product | Decorative and industrial paints, thinners |
| Production Capacity | 5–20 tons/day (depending on project capacity and selected equipment sizing) |
| Required Area | 500–1000 m² (subject to final layout and capacity) |
| Electrical Power | 380 V three-phase, 50–100 kW (depending on equipment selection and automation level) |
| Water Consumption | 10–20 m³/day |
| Manpower | 5–12 persons per shift (depending on automation level) |
| Main Machines | High-speed mixer, sand or ball mill, color tank, filling machine (2000–5000 cans/h), capping machine, labeling machine |
All figures are indicative. Detailed utility balances, equipment lists and layout drawings are prepared after process definition and capacity confirmation.
Products
An industrial paint and thinner production line can manufacture decorative paints, industrial paints and thinners of various colors and formulations according to market requirements.
Raw Materials for Paint and Thinner Factory
Raw material selection and quality control are critical for color, viscosity and shelf life. The main materials used are described below.
Main Raw Materials
- Resins, solvents, pigments, additives, water – Form the paint vehicle and pigment system.
- Thinner components – Used for thinning products.
Secondary / Optional Materials
- Packaging materials (cans, lids)
Storage and handling conditions must be controlled to preserve material quality and prevent contamination or solvent loss.
Sahi Rasa For Factories raw material
The Supply Chain Department is prepared to support identification, evaluation and supply of the main and auxiliary raw materials required by paint and thinner factories. Depending on the contractual scope, services may include supplier identification and evaluation, procurement and purchase coordination, specification control, logistics coordination, supply-chain design for continuous production, ongoing supply arrangements, and supply of materials from Iran for projects located in regional markets.
Registering an order for raw materials for the factory Paint and Thinner
Sahi Rasa Supply Chain Department
Raw-material supply chain support can be examined for industrial projects located in Iran, Iraq, the Kurdistan Region of Iraq (including Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Manufacturing Process
The industrial paint and thinner process follows a defined sequence of unit operations.
- Raw-Material Preparation – Resins, solvents, pigments, additives and water are accurately weighed.
- High-Speed Mixing – Ingredients are mixed in a high-speed mixer for efficient dispersion.
- Milling – Mixture is milled in a sand or ball mill to achieve fine pigment dispersion.
- Filtration and Viscosity Adjustment – Product is filtered and viscosity is adjusted with solvent or additives.
- Filling, Capping and Labeling – Paint is filled into cans (2000–5000 cans/h), capped and labeled.
Machinery & Equipment
Each main machine performs a specific function. Support is available for design, manufacturing or procurement, customization, installation, commissioning, repair, overhaul, refurbishment, automation and spare-parts supply according to the agreed project scope.
- High-Speed Mixer – Disperses ingredients efficiently. Position: first stage after weighing. Importance: initial dispersion. Quality impact: mixing intensity affects color development. Maintenance: agitators, seals and drives. Sahi Rasa support covers design and spare parts.
- Sand or Ball Mill – Achieves fine pigment dispersion. Core machine for fineness of grind. Position: after high-speed mixing. Quality impact: milling time and media determine particle size. Maintenance: media, liners and drives. Sahi Rasa provides specialized mill support and overhaul.
- Color Tank – Holds finished product. Position: after filtration. Quality impact: cleanliness and agitation. Maintenance: tanks and agitators.
- Filling Machine – Fills cans accurately (2000–5000 cans/h). Core machine for productivity. Position: after viscosity adjustment. Quality impact: fill accuracy and cleanliness. Maintenance: dosing valves, nozzles and sensors. Sahi Rasa provides specialized filler support and overhaul.
- Capping and Labeling Machines – Close and label cans. Position: after filling. Quality impact: seal integrity and label accuracy. Maintenance: heads, sensors and drives.
Factory Layout & Building Requirements
Typical functional areas include raw-material storage (including solvent storage with safety measures), mixing and milling hall, filtration and filling area, packaging, finished-goods warehouse, quality-control laboratory, utility rooms, maintenance workshop, staff facilities and loading docks. Layout must respect process flow, solvent safety and ventilation requirements. Exact area allocation is determined during the engineering phase according to capacity and product range.
Utilities
- Electricity: 380 V three-phase, typically 50–100 kW
- Water: 10–20 m³/day
- Ventilation for solvent vapors and explosion-proof provisions as required
- HVAC and drainage according to local regulations
Turnkey Factory Setup
An investor can start from an empty site. Depending on contractual scope, the project can be accompanied through: Idea → Feasibility → Engineering → Factory Design → Machinery → Procurement → Manufacturing → Installation → Commissioning → Training → Raw Material Supply → Packaging → Trial Production → Commercial Production. The objective is an operational factory ready for production under applicable safety standards.
EPC & PMC
Projects can be executed under EPC (Engineering, Procurement, Construction) or PMC (Project Management Consultancy) approaches. Engineering, machinery supply or manufacturing, installation supervision and commissioning are coordinated within the defined contract boundaries.
Machinery Repair
Existing paint factories can request inspection, troubleshooting, mechanical and electrical repair, component replacement, spare-parts supply and line maintenance support for mixers, mills, fillers and packaging machines.
Machinery Overhaul & Refurbishment
Older equipment can be evaluated for comprehensive overhaul, replacement of worn media and agitators, control-system upgrades, improved reliability and modest capacity or quality improvements where technically feasible.
Capacity Expansion
Capacity of an existing line can often be increased by addressing bottlenecks, upgrading key machines (mill, filler) or introducing selective automation.
Industrial Automation
Typical applications include PLC sequence control, viscosity and temperature monitoring, automatic dosing, HMI, data logging and optional SCADA integration.
Supply Chain
Factory = Machinery + Raw Materials + Utilities + People + Process + Supply Chain + Market. The Supply Chain Department supports supplier sourcing, procurement, logistics and ongoing material supply for paint projects.
Packaging
Can filling, capping, labeling, coding, cartoning and palletizing are integrated according to product format and market requirements.
Branding & Product Development
When required, support can be provided for product development, packaging design, graphic design, industrial design, branding and related marketing preparation.
Market & Country Sections
Engineering, machinery, installation, overhaul and supply-chain support are available for paint and thinner projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Sahi Rasa Services
| Service | Application in This Project |
|---|---|
| Feasibility Study | Technical and economic assessment of capacity, product mix and investment |
| Factory Design | Layout, process flow and utility design |
| Machinery Design / Manufacturing | Specification and coordinated supply or manufacturing of process equipment |
| Procurement | Sourcing of machinery, components and materials |
| Installation & Commissioning | Mechanical/electrical installation, start-up and performance testing |
| Automation | PLC, HMI, process control and optional SCADA |
| Raw Material Supply | Coordination via Supply Chain Department |
| Repair / Overhaul / Refurbishment | Restoration and modernization of existing machinery |
| Capacity Expansion | Engineering and implementation of throughput increases |
| Staff Training | Operational and basic maintenance training |
Why Sahi Rasa
Process engineering, machinery-related capabilities, procurement support, supply-chain coordination, installation, commissioning, training, maintenance support and automation are combined. The practical advantage is a more integrated execution path from concept to an operating production line under applicable safety standards.
From Empty Land to Production
Typical sequence: Feasibility → Engineering → Factory Design → Equipment Design → Machinery Manufacturing/Procurement → Logistics → Installation → Commissioning → Staff Training → Raw Material Supply → Trial Production → Commercial Production. Operational support for a defined initial period can be examined as a contractual option.
Who Should Contact Sahi Rasa?
- Investors – planning a new paint and thinner factory or production line
- Existing Factory Owners – needing repair, overhaul, refurbishment, modernization, automation or capacity expansion
- Industrial Buyers – requiring machinery, spare parts, raw materials or engineering services
Final CTA
If you intend to set up a paint and thinner production line or factory, if your existing plant needs repair, overhaul or capacity expansion, if you require new machinery or automation, or if you need coordination of raw-material supply, contact the Industrial Department.
Submit your request for: Factory Setup / Machinery / Repair / Overhaul / Refurbishment / Automation / Capacity Expansion / Raw Materials.
Registering an order for raw materials for the factory Paint and Thinner
FAQ
- What is the typical cost of setting up a paint factory?
Cost depends on capacity, product range, automation level, building and utility scope. A detailed estimate is prepared after process definition. - Which main machines are required?
High-speed mixer, sand or ball mill, color tank, filling machine, capping machine and labeling machine. - What production capacity can be designed?
Typical capacity ranges from 5 to 20 tons/day, determined during the engineering phase. - How much space is needed?
Typical process area ranges from approximately 500 to 1000 m², subject to final layout. - What are the main raw materials?
Resins, solvents, pigments, additives, water, thinner components and packaging materials. - Can raw materials be supplied?
Yes, via the Supply Chain Department according to project scope. - Is machinery manufacturing or procurement supported?
Design, manufacturing or coordinated procurement according to the agreed scope. - Can existing machines be repaired?
Yes – inspection, troubleshooting, mechanical/electrical repair and spare parts. - Is overhaul or refurbishment possible?
Yes – comprehensive restoration and control upgrades. - Can capacity of an existing line be increased?
Often yes, by addressing bottlenecks and upgrading key equipment. - Are turnkey projects executed?
Turnkey or partial turnkey scopes can be offered under defined contracts. - Are services available in Iraq and Kurdistan Region?
Yes, including Erbil, Sulaymaniyah, Duhok and other locations. - Are services available in Afghanistan?
Yes, including Kabul, Herat and Mazar-e-Sharif. - Can raw materials be supplied from Iran for regional projects?
Yes, coordination of material supply is part of possible supply-chain scope. - Is installation and commissioning included?
They can be included according to the selected contractual package.