Yogurt and Doogh Production Line and Factory Setup

A yogurt and doogh production line is a complete industrial system designed to transform milk into finished yogurt and doogh (yogurt drink) under controlled process conditions. The line produces set or stirred yogurt and flavoured doogh ready for packaging and distribution.

From an industrial perspective, yogurt manufacturing is important because it combines milk reception, pasteurization, homogenization, inoculation and fermentation, cooling, filling and CIP. The process relies on a defined sequence of unit operations that must be correctly engineered, sized and integrated.

Primary raw materials typically include milk, starter culture, milk powder, sugar, fruit, stabilizers and packaging materials. The core machinery set consists of pasteurizers (500–5000 L/h), homogenizers (1000–5000 L/h), fermentation tanks (1000–10 000 L), filling machines (2000–12 000 containers/h) and CIP systems.

The Industrial Department supports investors who want to establish a new yogurt plant as well as existing plant owners who need repair, overhaul, capacity expansion or automation of their current lines. Projects can start from an empty site or from an operating facility that requires technical upgrading.

Whether the goal is a green-field turnkey plant in Iraq, Kurdistan Region, Afghanistan or other regional markets, or the modernization of an existing line in Iran, engineering, machinery supply or manufacturing, installation, commissioning and ongoing technical support can be provided under defined contractual scopes.

Production Line Overview

The yogurt and doogh production line is engineered as an integrated process system covering milk reception, pasteurization, homogenization, fermentation, cooling, filling and packaging. Design capacity is determined during the engineering phase and can typically range from pilot or semi-industrial scales up to higher industrial throughputs, depending on final product mix and market requirements.

Product types include set yogurt, stirred yogurt and doogh (yogurt drink). The overall process flow follows a defined sequence: milk reception, pasteurization (85–95 °C), homogenization, inoculation and fermentation, cooling, filling and packaging.

Main machinery groups include pasteurizers, homogenizers, fermentation tanks, filling machines and CIP systems. Supporting infrastructure covers electrical power (100–300 kW), steam (300–800 kg/h) and water (10–30 m³/day).

Manpower requirements depend on the degree of automation (typically 8–15 persons per shift). Quality control covers acidity, texture, flavour and packaging integrity. Finished products are stored under refrigerated conditions before distribution.

Technical Specifications

Specification Description
Product Yogurt and doogh (depending on process and packaging configuration)
Production Capacity Depending on project capacity and selected equipment sizing (to be determined during engineering phase)
Required Area 500–1500 m² (subject to final layout and capacity)
Electrical Power 380 V three-phase, 100–300 kW
Steam 300–800 kg/h
Water Consumption 10–30 m³/day
Manpower 8–15 persons per shift
Main Machines Pasteurizer (500–5000 L/h), homogenizer (1000–5000 L/h), fermentation tank (1000–10 000 L), filling machine (2000–12 000 containers/h), CIP system
Packaging Cups, bottles or pouches according to selected equipment
Storage Refrigerated storage (final design defined in engineering)

All figures are indicative. Detailed utility balances, equipment lists and layout drawings are prepared after process definition and capacity confirmation.

Products

An industrial yogurt and doogh production line can manufacture set yogurt, stirred yogurt and flavoured doogh depending on formulation and process parameters. Packaging formats are selected according to target markets.

Raw Materials for Yogurt and Doogh Factory

Raw material selection and quality control are critical for texture, flavour and shelf life. The main materials are milk, starter culture, milk powder, sugar, fruit and stabilizers.

Sahi Rasa For Factories raw material

The Supply Chain Department is prepared to support identification, evaluation and supply of the main and auxiliary raw materials required by yogurt factories. Depending on the contractual scope, services may include supplier identification and evaluation, procurement and purchase coordination, specification control, logistics coordination, supply-chain design for continuous production, ongoing supply arrangements, and supply of materials from Iran for projects located in regional markets.

Registering an order for raw materials for the factory Yogurt and Doogh
Sahi Rasa Supply Chain Department

Raw-material supply chain support can be examined for industrial yogurt projects located in Iran, Iraq, the Kurdistan Region of Iraq (including Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.

Manufacturing Process

  1. Milk Reception – Raw milk is received, analysed and stored.
  2. Pasteurization – Milk is pasteurized at 85–95 °C (500–5000 L/h).
  3. Homogenization – Milk is homogenized (1000–5000 L/h).
  4. Fermentation – Inoculated milk is fermented in tanks (1000–10 000 L).
  5. Cooling, Filling and Packaging – Product is cooled, filled (2000–12 000 containers/h) and packaged.

Machinery & Equipment

  • Pasteurizer – Heat-treats the milk. Position: after reception. Importance: foundation of product safety. Quality impact: temperature and holding time control microbial quality. Maintenance: plates, gaskets and controls. Sahi Rasa Support: design, manufacturing/procurement, installation, repair, overhaul and automation.
  • Homogenizer – Reduces fat globule size. Position: after pasteurization. Quality impact: texture and stability. Maintenance: valves, pistons and seals. Sahi Rasa Support: design, installation, repair and spare parts.
  • Fermentation Tank – Holds product during fermentation (1000–10 000 L). Position: core of the process. Importance: determines acidity and texture development. Quality impact: temperature and time control quality. Maintenance: jackets, agitation and CIP. Sahi Rasa Support: design, installation, repair and overhaul.
  • Filling Machine and CIP System – Fill the product and clean the line. Position: end of line / supporting. Quality impact: fill accuracy, hygiene and package integrity. Maintenance: dosing systems and CIP circuits. Sahi Rasa Support: installation, repair and spare parts.

Factory Layout & Building Requirements

Typical functional areas include milk reception, processing (pasteurization, homogenization, fermentation), filling and packaging, cold storage, CIP, utility rooms, maintenance workshop, staff facilities and loading docks. Layout must respect hygienic zoning and process flow. Exact area allocation is determined during the engineering phase according to capacity.

Utilities

  • Electricity: 380 V three-phase, typically 100–300 kW
  • Steam: 300–800 kg/h
  • Water: 10–30 m³/day
  • Refrigeration and hygiene controls according to local regulations

Turnkey Factory Setup

An investor can start from an empty site. Depending on contractual scope, the project can be accompanied through: Idea → Feasibility → Engineering → Factory Design → Machinery → Procurement → Manufacturing → Installation → Commissioning → Training → Raw Material Supply → Packaging → Trial Production → Commercial Production. The objective is an operational factory ready for production.

EPC & PMC

Projects can be executed under EPC or PMC approaches. Engineering, machinery supply or manufacturing, installation supervision and commissioning are coordinated within the defined contract boundaries.

Machinery Repair

Existing yogurt plants can request inspection, troubleshooting, mechanical and electrical repair, component replacement, spare-parts supply and line maintenance support for pasteurizers, homogenizers, fermentation tanks and filling machines.

Machinery Overhaul & Refurbishment

Older equipment can be evaluated for comprehensive overhaul, replacement of worn parts, control-system upgrades, improved reliability and modest capacity or quality improvements where technically feasible.

Capacity Expansion

Capacity of an existing line can often be increased by addressing bottlenecks, upgrading key machines, improving packaging rate or introducing selective automation.

Industrial Automation

Typical applications include PLC sequence control, temperature loops, HMI, data logging and optional SCADA integration.

Supply Chain

Factory = Machinery + Raw Materials + Utilities + People + Process + Supply Chain + Market. The Supply Chain Department supports supplier sourcing, procurement, logistics and ongoing material supply for yogurt projects.

Packaging

Filling, sealing, labeling, coding and secondary packaging are integrated according to product format and market requirements.

Branding & Product Development

When required, support can be provided for product development, packaging design, graphic design, branding and related marketing preparation.

Market & Country Sections

Engineering, machinery, installation, overhaul and supply-chain support are available for yogurt projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.

Sahi Rasa Services

Service Application in This Project
Feasibility Study Technical and economic assessment of capacity, product mix and investment
Factory Design Layout, process flow and utility design
Machinery Design / Manufacturing Specification and coordinated supply or manufacturing of process equipment
Procurement Sourcing of machinery, components and materials
Installation & Commissioning Mechanical/electrical installation, start-up and performance testing
Automation PLC, HMI, process control and optional SCADA
Raw Material Supply Coordination via Supply Chain Department
Repair / Overhaul / Refurbishment Restoration and modernization of existing machinery
Capacity Expansion Engineering and implementation of throughput increases
Staff Training Operational and basic maintenance training

Why Sahi Rasa

Process engineering, machinery-related capabilities, procurement support, supply-chain coordination, installation, commissioning, training, maintenance support and automation are combined. The practical advantage is a more integrated execution path from concept to an operating production line.

From Empty Land to Production

Typical sequence: Feasibility → Engineering → Factory Design → Equipment Design → Machinery Manufacturing/Procurement → Logistics → Installation → Commissioning → Staff Training → Raw Material Supply → Trial Production → Commercial Production. Operational support for a defined initial period can be examined as a contractual option.

Who Should Contact Sahi Rasa?

  • Investors – planning a new yogurt and doogh factory or production line
  • Existing Factory Owners – needing repair, overhaul, refurbishment, modernization, automation or capacity expansion
  • Industrial Buyers – requiring machinery, spare parts, raw materials or engineering services

Final CTA

If you intend to set up a yogurt and doogh production line or factory, if your existing plant needs repair, overhaul or capacity expansion, if you require new machinery or automation, or if you need coordination of raw-material supply, contact the Industrial Department.

Submit your request for: Factory Setup / Machinery / Repair / Overhaul / Refurbishment / Automation / Capacity Expansion / Raw Materials.

Registering an order for raw materials for the factory Yogurt and Doogh

FAQ

  1. What is the typical cost of setting up a yogurt plant?
    Cost depends on capacity, product range, automation level, building and utility scope. A detailed estimate is prepared after process definition.
  2. Which main machines are required?
    Pasteurizer, homogenizer, fermentation tank, filling machine and CIP system.
  3. What production capacity can be designed?
    Capacity is determined during the engineering phase according to market demand and investment criteria.
  4. How much space is needed?
    Typical process area ranges from approximately 500 to 1500 m², subject to final layout.
  5. What are the main raw materials?
    Milk, starter culture, milk powder, sugar, fruit and stabilizers.
  6. Can raw materials be supplied?
    Yes, via the Supply Chain Department according to project scope.
  7. Is machinery manufacturing or procurement supported?
    Design, manufacturing or coordinated procurement according to the agreed scope.
  8. Can existing machines be repaired?
    Yes – inspection, troubleshooting, mechanical/electrical repair and spare parts.
  9. Is overhaul or refurbishment possible?
    Yes – comprehensive restoration and control upgrades.
  10. Can capacity of an existing line be increased?
    Often yes, by addressing bottlenecks and upgrading key equipment.
  11. Are turnkey projects executed?
    Turnkey or partial turnkey scopes can be offered under defined contracts.
  12. Are services available in Iraq and Kurdistan Region?
    Yes, including Erbil, Sulaymaniyah, Duhok and other locations.
  13. Are services available in Afghanistan?
    Yes, including Kabul, Herat and Mazar-e-Sharif.
  14. Can raw materials be supplied from Iran for regional projects?
    Yes, coordination of material supply is part of possible supply-chain scope.
  15. Is installation and commissioning included?
    They can be included according to the selected contractual package.