Portfolio
Building Gypsum Production Line and Factory Setup
A building gypsum production line is a complete industrial system designed to transform gypsum rock into finished building gypsum (plaster) under controlled process conditions. The line produces plaster powder ready for packaging and distribution.
From an industrial perspective, gypsum manufacturing is important because it combines crushing, screening, calcination (150–200 °C) to remove crystallization water, grinding and packaging. The process relies on a defined sequence of unit operations that must be correctly engineered, sized and integrated.
Primary raw materials typically include gypsum rock, optional additives and packaging materials. The core machinery set consists of cubit crushers, screens, calcination kilns (low-burn or high-burn), bag filters, mills and packaging machines.
The Industrial Department supports investors who want to establish a new gypsum plant as well as existing plant owners who need repair, overhaul, capacity expansion or automation of their current lines. Projects can start from an empty site or from an operating facility that requires technical upgrading.
Whether the goal is a green-field turnkey plant in Iraq, Kurdistan Region, Afghanistan or other regional markets, or the modernization of an existing line in Iran, engineering, machinery supply or manufacturing, installation, commissioning and ongoing technical support can be provided under defined contractual scopes.
Production Line Overview
The building gypsum production line is engineered as an integrated process system covering crushing, screening, storage, calcination, dust collection, grinding and packaging. Design capacity is determined during the engineering phase and can typically range from pilot or semi-industrial scales up to higher industrial throughputs, depending on final product mix and market requirements.
Product types include building gypsum (plaster) of various fineness grades. The overall process flow follows a defined sequence: mining/extraction, crushing, screening, silo storage, calcination, bag-filter dust collection, grinding, screening and packaging.
Main machinery groups include cubit crushers, screens, calcination kilns, bag filters, mills and packaging systems. Supporting infrastructure covers electrical power (50–100 kW range), gas (100–300 m³/h) and dust collection.
Manpower requirements depend on the degree of automation (typically 5–12 persons per shift). Quality control covers residual moisture, setting time, fineness and purity. Finished gypsum is stored in silos or bags before dispatch.
Technical Specifications
| Specification | Description |
|---|---|
| Product | Building gypsum / plaster (bags – depending on packaging configuration) |
| Production Capacity | Depending on project capacity and selected equipment sizing (to be determined during engineering phase) |
| Required Area | 500–1000 m² (subject to final layout and capacity) |
| Electrical Power | 380 V three-phase, 50–100 kW |
| Gas Consumption | 100–300 m³/h |
| Water Consumption | 5–10 m³/day |
| Manpower | 5–12 persons per shift |
| Main Machines | Cubit crusher, screen, calcination kiln, bag filter, mill, packaging machine |
| Packaging | Bags according to selected equipment |
| Storage | Silo or bag storage (final design defined in engineering) |
All figures are indicative. Detailed utility balances, equipment lists and layout drawings are prepared after process definition and capacity confirmation.
Products
An industrial building gypsum production line can manufacture plaster of different fineness and setting characteristics depending on calcination and grinding parameters. Packaging formats are selected according to target markets.
Raw Materials for Building Gypsum Factory
The main raw material is gypsum rock. Optional additives may be used to adjust setting time or other properties. Quality of incoming rock (purity, moisture) directly influences final product performance.
Sahi Rasa For Factories raw material
The Supply Chain Department is prepared to support identification, evaluation and supply of the main and auxiliary raw materials required by gypsum factories. Depending on the contractual scope, services may include supplier identification and evaluation, procurement and purchase coordination, specification control, logistics coordination, supply-chain design for continuous production, ongoing supply arrangements, and supply of materials from Iran for projects located in regional markets.
Registering an order for raw materials for the factory Building Gypsum
Sahi Rasa Supply Chain Department
Raw-material supply chain support can be examined for industrial gypsum projects located in Iran, Iraq, the Kurdistan Region of Iraq (including Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Manufacturing Process
- Extraction and Crushing – Gypsum rock is extracted and crushed in a cubit crusher.
- Screening and Storage – Crushed material is screened and stored in silos.
- Calcination – Material is calcined at 150–200 °C in a low-burn or high-burn kiln to remove crystallization water.
- Dust Collection – Exhaust gases pass through bag filters.
- Grinding and Packaging – Calcined gypsum is ground to the required fineness and packaged.
Machinery & Equipment
- Cubit Crusher – Primary size reduction of gypsum rock. Position: first process stage. Importance: prepares feed for calcination. Quality impact: particle size affects calcination efficiency. Maintenance: hammers, screens and drives. Sahi Rasa Support: specification, installation, repair and spare parts.
- Calcination Kiln – Removes crystallization water at 150–200 °C. Position: core of the process. Importance: determines product quality and capacity. Quality impact: residual moisture and setting behaviour. Maintenance: refractory, burners and controls. Sahi Rasa Support: design, installation, repair, overhaul and automation.
- Bag Filter – Dust collection from kiln exhaust. Position: after kiln. Quality impact: environmental compliance and material recovery. Maintenance: filter bags and fans. Sahi Rasa Support: installation, repair and spare parts.
- Mill – Grinds calcined gypsum to fine powder. Position: after calcination. Quality impact: fineness and performance of plaster. Maintenance: liners, media and bearings. Sahi Rasa Support: installation, repair and spare parts.
- Packaging Machine – Fills bags with finished gypsum. Position: end of line. Quality impact: net weight and bag integrity. Maintenance: dosing systems. Sahi Rasa Support: installation, repair and spare parts.
Factory Layout & Building Requirements
Typical functional areas include raw-material storage, crushing, calcination, grinding, packaging, dust collection, utility rooms, maintenance workshop, staff facilities and loading docks. Layout must respect material flow and dust control. Exact area allocation is determined during the engineering phase according to capacity.
Utilities
- Electricity: 380 V three-phase, typically 50–100 kW
- Gas: 100–300 m³/h
- Water: 5–10 m³/day
- Dust collection according to local regulations
Turnkey Factory Setup
An investor can start from an empty site. Depending on contractual scope, the project can be accompanied through: Idea → Feasibility → Engineering → Factory Design → Machinery → Procurement → Manufacturing → Installation → Commissioning → Training → Raw Material Supply → Packaging → Trial Production → Commercial Production. The objective is an operational factory ready for production.
EPC & PMC
Projects can be executed under EPC or PMC approaches. Engineering, machinery supply or manufacturing, installation supervision and commissioning are coordinated within the defined contract boundaries.
Machinery Repair
Existing gypsum plants can request inspection, troubleshooting, mechanical and electrical repair, component replacement, spare-parts supply and line maintenance support for crushers, kilns, mills and packaging machines.
Machinery Overhaul & Refurbishment
Older equipment can be evaluated for comprehensive overhaul, replacement of worn parts, control-system upgrades, improved reliability and modest capacity or quality improvements where technically feasible.
Capacity Expansion
Capacity of an existing line can often be increased by addressing bottlenecks, upgrading key machines (kiln, mill), improving packaging rate or introducing selective automation.
Industrial Automation
Typical applications include PLC sequence control, temperature loops, HMI, data logging and optional SCADA integration.
Supply Chain
Factory = Machinery + Raw Materials + Utilities + People + Process + Supply Chain + Market. The Supply Chain Department supports supplier sourcing, procurement, logistics and ongoing material supply for gypsum projects.
Packaging
Bagging, labeling, coding and palletizing are integrated according to product format and market requirements.
Branding & Product Development
When required, support can be provided for product development, packaging design, graphic design, branding and related marketing preparation.
Market & Country Sections
Engineering, machinery, installation, overhaul and supply-chain support are available for gypsum projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Sahi Rasa Services
| Service | Application in This Project |
|---|---|
| Feasibility Study | Technical and economic assessment of capacity, product mix and investment |
| Factory Design | Layout, process flow and utility design |
| Machinery Design / Manufacturing | Specification and coordinated supply or manufacturing of process equipment |
| Procurement | Sourcing of machinery, components and materials |
| Installation & Commissioning | Mechanical/electrical installation, start-up and performance testing |
| Automation | PLC, HMI, process control and optional SCADA |
| Raw Material Supply | Coordination via Supply Chain Department |
| Repair / Overhaul / Refurbishment | Restoration and modernization of existing machinery |
| Capacity Expansion | Engineering and implementation of throughput increases |
| Staff Training | Operational and basic maintenance training |
Why Sahi Rasa
Process engineering, machinery-related capabilities, procurement support, supply-chain coordination, installation, commissioning, training, maintenance support and automation are combined. The practical advantage is a more integrated execution path from concept to an operating production line.
From Empty Land to Production
Typical sequence: Feasibility → Engineering → Factory Design → Equipment Design → Machinery Manufacturing/Procurement → Logistics → Installation → Commissioning → Staff Training → Raw Material Supply → Trial Production → Commercial Production. Operational support for a defined initial period can be examined as a contractual option.
Who Should Contact Sahi Rasa?
- Investors – planning a new building gypsum factory or production line
- Existing Factory Owners – needing repair, overhaul, refurbishment, modernization, automation or capacity expansion
- Industrial Buyers – requiring machinery, spare parts, raw materials or engineering services
Final CTA
If you intend to set up a building gypsum production line or factory, if your existing plant needs repair, overhaul or capacity expansion, if you require new machinery or automation, or if you need coordination of raw-material supply, contact the Industrial Department.
Submit your request for: Factory Setup / Machinery / Repair / Overhaul / Refurbishment / Automation / Capacity Expansion / Raw Materials.
Registering an order for raw materials for the factory Building Gypsum
FAQ
- What is the typical cost of setting up a gypsum plant?
Cost depends on capacity, product range, automation level, building and utility scope. A detailed estimate is prepared after process definition. - Which main machines are required?
Cubit crusher, screen, calcination kiln, bag filter, mill and packaging machine. - What production capacity can be designed?
Capacity is determined during the engineering phase according to market demand and investment criteria. - How much space is needed?
Typical process area ranges from approximately 500 to 1000 m², subject to final layout. - What are the main raw materials?
Gypsum rock and optional additives. - Can raw materials be supplied?
Yes, via the Supply Chain Department according to project scope. - Is machinery manufacturing or procurement supported?
Design, manufacturing or coordinated procurement according to the agreed scope. - Can existing machines be repaired?
Yes – inspection, troubleshooting, mechanical/electrical repair and spare parts. - Is overhaul or refurbishment possible?
Yes – comprehensive restoration and control upgrades. - Can capacity of an existing line be increased?
Often yes, by addressing bottlenecks and upgrading key equipment. - Are turnkey projects executed?
Turnkey or partial turnkey scopes can be offered under defined contracts. - Are services available in Iraq and Kurdistan Region?
Yes, including Erbil, Sulaymaniyah, Duhok and other locations. - Are services available in Afghanistan?
Yes, including Kabul, Herat and Mazar-e-Sharif. - Can raw materials be supplied from Iran for regional projects?
Yes, coordination of material supply is part of possible supply-chain scope. - Is installation and commissioning included?
They can be included according to the selected contractual package.