Date Processing Production Line and Factory Setup

A date processing production line is an industrial food processing system designed to process dates through cleaning, sorting, washing, pitting (optional), drying or pasteurization, packaging, and related value-added operations. The process produces cleaned, sorted, and packaged dates with controlled quality and shelf life.

Main raw materials include fresh or dried dates and packaging materials. Core equipment consists of cleaning and sorting systems, washers, pitters, dryers or pasteurizers, and packaging machines.

The Industrial Department supports new investors establishing a date processing factory and existing plant owners requiring repair, overhaul, capacity expansion, or automation.

Engineering, machinery supply or manufacturing, installation, commissioning, and technical support can be provided for projects in Iran, Iraq, Kurdistan Region, Afghanistan, and other regional markets under defined contractual scopes.

Production Line Overview

Capacity is determined during engineering and is typically expressed in kilograms or tons per hour. The process sequence is: date reception and cleaning, sorting, washing, optional pitting, drying or pasteurization, and packaging.

Main machinery includes cleaning and sorting system, washer, pitter (if required), dryer or pasteurizer, and packaging machine. Required area depends on capacity. Manpower is moderate.

Technical Specifications

Specification Description
Product Cleaned, sorted, and packaged dates (with or without pits)
Production Capacity Depending on project capacity (to be determined during engineering phase)
Required Area Depending on capacity and layout
Electrical Power Depending on scale
Manpower Moderate operational team
Main Machines Cleaning and sorting system, washer, pitter, dryer or pasteurizer, packaging machine

Products

Cleaned and sorted dates, pitted dates, and packaged dates in various formats.

Raw Materials for Date Processing Factory

Fresh or dried dates and packaging materials.

Sahi Rasa For Factories raw material

The Supply Chain Department supports identification, evaluation, and supply of packaging materials and related inputs.

Registering an order for raw materials for the factory Date Processing
Sahi Rasa Supply Chain Department

Support can be examined for projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia, and Georgia.

Manufacturing Process

  1. Date reception and cleaning
  2. Sorting
  3. Washing
  4. Optional pitting
  5. Drying or pasteurization
  6. Packaging

Machinery & Equipment

  • Cleaning and sorting system
  • Washer
  • Pitter (if required)
  • Dryer or pasteurizer
  • Packaging machine

Support is available for design, manufacturing or procurement, installation, commissioning, repair, overhaul, refurbishment, automation, and spare parts.

Factory Layout & Building Requirements

Date storage and reception area, cleaning and sorting zone, processing hall, packaging, and finished goods storage. Hygiene is important.

Utilities

  • Electrical power
  • Process water
  • Compressed air

Turnkey Factory Setup

Projects can start from an empty site and progress through the full sequence according to contractual scope.

EPC & PMC

Execution under EPC or PMC approaches is possible.

Machinery Repair

Existing lines can receive inspection, troubleshooting, repair, and spare-parts support.

Machinery Overhaul & Refurbishment

Older sorting systems, pitters, and packaging machines can be overhauled and modernized.

Capacity Expansion

Capacity can be increased by upgrading sorting or packaging capacity, or by adding parallel lines.

Industrial Automation

Possible applications include automatic sorting, filling, and packaging automation.

Supply Chain

Stable supply of dates and packaging materials is essential. The Supply Chain Department supports sourcing and logistics.

Packaging

Dates are packed in boxes, trays, or other formats according to market requirements.

Branding & Product Development

Support can be provided for product development when required.

Market & Country Sections

Support is available for date processing projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia, and Georgia.

Sahi Rasa Services

Service Application in This Project
Feasibility Study Assessment of capacity and investment
Factory Design Layout and utility design
Machinery Design / Manufacturing Specification and coordinated supply of equipment
Procurement Sourcing of machinery and materials
Installation & Commissioning Installation, start-up, and performance testing
Automation Sorting and packaging systems
Raw Material Supply Coordination via Supply Chain Department
Repair / Overhaul / Refurbishment Restoration of existing lines
Capacity Expansion Throughput improvement measures
Staff Training Operational and maintenance training

Why Sahi Rasa

Integrated engineering, machinery, procurement, installation, commissioning, and supply-chain support provide a practical path from concept to operating production line.

From Empty Land to Production

Typical sequence from feasibility through commercial production.

Who Should Contact Sahi Rasa?

  • Investors – planning a new date processing factory
  • Existing Factory Owners – needing repair, overhaul, or capacity expansion
  • Industrial Buyers – requiring machinery, spare parts, or materials

Final CTA

If you intend to set up a date processing production line, if your existing plant needs repair or capacity expansion, or if you need machinery or raw-material coordination, contact the Industrial Department.

Registering an order for raw materials for the factory Date Processing

FAQ

  1. What products can be produced?
    Cleaned, sorted, pitted, and packaged dates.
  2. What is the typical capacity?
    Capacity is determined during engineering and is usually expressed in kg or tons per hour.
  3. What are the main raw materials?
    Dates and packaging materials.
  4. Can raw materials be supplied?
    Yes, via the Supply Chain Department (especially packaging).
  5. Can existing equipment be repaired or overhauled?
    Yes.
  6. Is capacity expansion possible?
    Yes.
  7. Are services available in Iraq and Afghanistan?
    Yes.
  8. Is turnkey execution available?
    Turnkey or partial scopes can be offered under contract.
  9. Is installation and commissioning included?
    They can be included according to the selected package.
  10. Is sorting important?
    Yes, proper sorting ensures consistent quality and value.