Portfolio
Date Processing Production Line and Factory Setup
A date processing production line is an industrial food processing system designed to process dates through cleaning, sorting, washing, pitting (optional), drying or pasteurization, packaging, and related value-added operations. The process produces cleaned, sorted, and packaged dates with controlled quality and shelf life.
Main raw materials include fresh or dried dates and packaging materials. Core equipment consists of cleaning and sorting systems, washers, pitters, dryers or pasteurizers, and packaging machines.
The Industrial Department supports new investors establishing a date processing factory and existing plant owners requiring repair, overhaul, capacity expansion, or automation.
Engineering, machinery supply or manufacturing, installation, commissioning, and technical support can be provided for projects in Iran, Iraq, Kurdistan Region, Afghanistan, and other regional markets under defined contractual scopes.
Production Line Overview
Capacity is determined during engineering and is typically expressed in kilograms or tons per hour. The process sequence is: date reception and cleaning, sorting, washing, optional pitting, drying or pasteurization, and packaging.
Main machinery includes cleaning and sorting system, washer, pitter (if required), dryer or pasteurizer, and packaging machine. Required area depends on capacity. Manpower is moderate.
Technical Specifications
| Specification | Description |
|---|---|
| Product | Cleaned, sorted, and packaged dates (with or without pits) |
| Production Capacity | Depending on project capacity (to be determined during engineering phase) |
| Required Area | Depending on capacity and layout |
| Electrical Power | Depending on scale |
| Manpower | Moderate operational team |
| Main Machines | Cleaning and sorting system, washer, pitter, dryer or pasteurizer, packaging machine |
Products
Cleaned and sorted dates, pitted dates, and packaged dates in various formats.
Raw Materials for Date Processing Factory
Fresh or dried dates and packaging materials.
Sahi Rasa For Factories raw material
The Supply Chain Department supports identification, evaluation, and supply of packaging materials and related inputs.
Registering an order for raw materials for the factory Date Processing
Sahi Rasa Supply Chain Department
Support can be examined for projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia, and Georgia.
Manufacturing Process
- Date reception and cleaning
- Sorting
- Washing
- Optional pitting
- Drying or pasteurization
- Packaging
Machinery & Equipment
- Cleaning and sorting system
- Washer
- Pitter (if required)
- Dryer or pasteurizer
- Packaging machine
Support is available for design, manufacturing or procurement, installation, commissioning, repair, overhaul, refurbishment, automation, and spare parts.
Factory Layout & Building Requirements
Date storage and reception area, cleaning and sorting zone, processing hall, packaging, and finished goods storage. Hygiene is important.
Utilities
- Electrical power
- Process water
- Compressed air
Turnkey Factory Setup
Projects can start from an empty site and progress through the full sequence according to contractual scope.
EPC & PMC
Execution under EPC or PMC approaches is possible.
Machinery Repair
Existing lines can receive inspection, troubleshooting, repair, and spare-parts support.
Machinery Overhaul & Refurbishment
Older sorting systems, pitters, and packaging machines can be overhauled and modernized.
Capacity Expansion
Capacity can be increased by upgrading sorting or packaging capacity, or by adding parallel lines.
Industrial Automation
Possible applications include automatic sorting, filling, and packaging automation.
Supply Chain
Stable supply of dates and packaging materials is essential. The Supply Chain Department supports sourcing and logistics.
Packaging
Dates are packed in boxes, trays, or other formats according to market requirements.
Branding & Product Development
Support can be provided for product development when required.
Market & Country Sections
Support is available for date processing projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia, and Georgia.
Sahi Rasa Services
| Service | Application in This Project |
|---|---|
| Feasibility Study | Assessment of capacity and investment |
| Factory Design | Layout and utility design |
| Machinery Design / Manufacturing | Specification and coordinated supply of equipment |
| Procurement | Sourcing of machinery and materials |
| Installation & Commissioning | Installation, start-up, and performance testing |
| Automation | Sorting and packaging systems |
| Raw Material Supply | Coordination via Supply Chain Department |
| Repair / Overhaul / Refurbishment | Restoration of existing lines |
| Capacity Expansion | Throughput improvement measures |
| Staff Training | Operational and maintenance training |
Why Sahi Rasa
Integrated engineering, machinery, procurement, installation, commissioning, and supply-chain support provide a practical path from concept to operating production line.
From Empty Land to Production
Typical sequence from feasibility through commercial production.
Who Should Contact Sahi Rasa?
- Investors – planning a new date processing factory
- Existing Factory Owners – needing repair, overhaul, or capacity expansion
- Industrial Buyers – requiring machinery, spare parts, or materials
Final CTA
If you intend to set up a date processing production line, if your existing plant needs repair or capacity expansion, or if you need machinery or raw-material coordination, contact the Industrial Department.
Registering an order for raw materials for the factory Date Processing
FAQ
- What products can be produced?
Cleaned, sorted, pitted, and packaged dates. - What is the typical capacity?
Capacity is determined during engineering and is usually expressed in kg or tons per hour. - What are the main raw materials?
Dates and packaging materials. - Can raw materials be supplied?
Yes, via the Supply Chain Department (especially packaging). - Can existing equipment be repaired or overhauled?
Yes. - Is capacity expansion possible?
Yes. - Are services available in Iraq and Afghanistan?
Yes. - Is turnkey execution available?
Turnkey or partial scopes can be offered under contract. - Is installation and commissioning included?
They can be included according to the selected package. - Is sorting important?
Yes, proper sorting ensures consistent quality and value.