Halva (Sugar and Tahini Halva) Production Line and Factory Setup
A sugar and tahini (ardeh) halva production line is an integrated industrial system designed to process sesame seeds into tahini, prepare sugar syrup, combine them under controlled conditions and package traditional and industrial halva under hygienic conditions. The line produces sesame-based and sugar-based halvah with consistent texture and flavor.
From an industrial perspective, halva manufacturing is important because it combines precise sesame dehulling, roasting, milling, syrup cooking and controlled mixing to achieve the characteristic fibrous or smooth texture and long shelf life of traditional and modern halvah. The process relies on a defined sequence of unit operations that must be correctly engineered and integrated.
Primary raw materials typically include sesame seeds, sugar, glucose, water, flavorings (saffron, rose water) and optional soapwort root extract. Core machinery consists of sesame dehullers, stone or colloidal mills, 60 kg halva cooking kettles, industrial mixers and packaging machines.
The Industrial Department supports investors establishing a new halva factory as well as existing plant owners requiring repair, overhaul, capacity expansion or automation of current halva lines. Projects can start from an empty site or from an operating facility that needs technical upgrading.
Whether the goal is a green-field turnkey halva plant in Iraq, Kurdistan Region, Afghanistan or other regional markets, or the modernization of an existing line in Iran, engineering, machinery supply or manufacturing, installation, commissioning and ongoing technical support can be provided under defined contractual scopes.
Production Line Overview
The sugar and tahini halva production line is engineered as an integrated process system covering sesame cleaning, soaking, dehulling, washing, drying, roasting, milling into tahini, syrup preparation, mixing in cooking kettles, cooling and packaging. Design capacity is determined during the engineering phase and can typically support industrial throughputs depending on final product mix and market requirements.
Product types include tahini (ardeh) halva, sugar-based halva, saffron and rose-flavored varieties and various retail or bulk packaging formats. The overall process flow follows a defined sequence for tahini preparation (cleaning, soaking 6–8 h, dehulling, washing, drying, roasting, milling) and parallel syrup preparation, followed by mixing, cooling and packaging.
Main machinery groups include sesame dehullers (stainless steel, three-phase motor, pneumatic door), stone or colloidal mills, 60 kg halva cooking kettles, industrial mixers and packaging machines. Supporting infrastructure covers electrical power, steam or gas, process water and compressed air.
Manpower requirements depend on the degree of automation. Quality control covers sesame quality, tahini fineness, syrup brix, final texture and packaging integrity. Finished halvah is stored under cool, dry conditions before distribution.
Technical Specifications
The following technical data represent typical ranges for an industrial sugar and tahini halvah production line. Final values are defined during basic and detailed engineering and may vary according to selected technology, level of automation, product portfolio and factory layout. For precise project-specific figures, contact the Industrial Department.
| Specification | Description |
|---|---|
| Product | Tahini (ardeh) halvah and sugar-based halvah (various flavors and pack formats) |
| Production Capacity | Depending on project capacity and selected equipment sizing (to be determined during engineering phase) |
| Required Area | 300–600 m² (subject to final layout and capacity) |
| Electrical Power | 380 V three-phase, 30–80 kW (depending on equipment selection and automation level) |
| Steam / Gas | 100–300 kg steam per hour (or equivalent) |
| Water Consumption | 5–10 m³/day |
| Manpower | 5–12 persons per shift (depending on automation level) |
| Main Machines | Sesame dehuller, stone or colloidal mill, 60 kg halva cooking kettle, industrial mixer, packaging machine |
| Soaking Time | Typically 6–8 hours for sesame |
All figures are indicative. Detailed utility balances, equipment lists and layout drawings are prepared after process definition and capacity confirmation.
Products
An industrial halvah production line can manufacture a variety of finished products depending on the selected formulation and mixing configuration. Typical product families include:
- Tahini (ardeh) halvah
- Sugar-based halvah
- Saffron and rose-flavored halvah
- Traditional Tabrizi-style halvah
- Retail and bulk packaging formats
Variant development (texture, flavor, packaging size) is defined during product development and process engineering according to target markets.
Raw Materials for Halva Factory
Raw material selection and quality control are critical for texture, flavor and shelf life. The main materials used are described below.
Main Raw Materials
- Sesame seeds – Provide the tahini base. Quality of incoming sesame (oil content, cleanliness) directly influences final texture and flavor.
- Sugar and glucose – Provide the syrup phase.
- Water – Used for soaking and syrup preparation.
Secondary / Optional Materials
- Soapwort root extract (for traditional texture)
- Saffron, rose water and other flavorings
- Colors
- Packaging materials
Storage and handling conditions must be controlled to preserve sesame oil quality and prevent rancidity.
Sahi Rasa For Factories raw material
The Supply Chain Department is prepared to support identification, evaluation and supply of the main and auxiliary raw materials required by halvah factories. Depending on the contractual scope, services may include supplier identification and evaluation, procurement and purchase coordination, specification control, logistics coordination, supply-chain design for continuous production, ongoing supply arrangements, and supply of materials from Iran for projects located in regional markets.
Registering an order for raw materials for the factory Halva (Sugar and Tahini)
Sahi Rasa Supply Chain Department
Raw-material supply chain support can be examined for industrial halvah projects located in Iran, Iraq, the Kurdistan Region of Iraq (including Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Manufacturing Process
The industrial halvah process follows a defined sequence of unit operations.
- Sesame Cleaning and Soaking – Sesame is cleaned and soaked for 6–8 hours to soften the hulls.
- Dehulling, Washing and Drying – Hulls are removed by a dehuller; seeds are washed and dried.
- Roasting – Dried seeds are roasted to develop flavor and aroma.
- Milling – Roasted seeds are milled in a stone or colloidal mill to produce tahini (ardeh).
- Syrup Preparation – Sugar, water, glucose and flavorings (saffron, rose water) are cooked into a syrup.
- Mixing – Tahini and syrup are combined in a 60 kg cooking kettle with continuous mixing until the desired consistency is reached.
- Cooling and Packaging – The mass is cooled and packaged.
Machinery & Equipment
Each main machine performs a specific function. Support is available for design, manufacturing or procurement, customization, installation, commissioning, repair, overhaul, refurbishment, automation and spare-parts supply according to the agreed project scope.
- Sesame Dehuller – Removes hulls after soaking (stainless steel, three-phase motor, pneumatic door). Position: after soaking. Importance: clean dehulling improves tahini quality. Quality impact: residual hulls affect texture and color. Maintenance: rollers, screens and pneumatic system. Sahi Rasa support covers design, manufacturing/procurement, installation, repair and spare parts.
- Stone or Colloidal Mill – Mills roasted sesame into fine tahini. Core machine for tahini fineness. Position: after roasting. Quality impact: particle size determines smoothness of final halvah. Maintenance: stones or discs, bearings and seals. Sahi Rasa provides specialized mill support and overhaul.
- Halva Cooking Kettle (60 kg) – Mixes tahini and syrup under controlled heat. Core machine for final texture. Position: after milling and syrup preparation. Quality impact: temperature and mixing time control fibrous or smooth structure. Maintenance: jacket, agitator and temperature control. Sahi Rasa provides specialized kettle support and overhaul.
- Industrial Mixer – Ensures uniform combination of phases. Position: integrated with kettle or downstream. Quality impact: blend uniformity. Maintenance: paddles and drive.
- Packaging Machine – Packages finished halvah. Position: end of line. Quality impact: pack integrity and appearance. Maintenance: sealing and dosing systems.
Factory Layout & Building Requirements
Typical functional areas include sesame receiving and storage, soaking and dehulling area, roasting and milling hall, syrup cooking and mixing area, cooling and packaging, finished-goods warehouse, quality-control laboratory, utility rooms (steam, gas), maintenance workshop, staff facilities and loading docks. Layout must respect hygienic zoning, heat extraction and process flow. Exact area allocation is determined during the engineering phase according to capacity and product range.
Utilities
- Electricity: 380 V three-phase, typically 30–80 kW
- Steam / gas: 100–300 kg steam per hour (or equivalent)
- Water: 5–10 m³/day
- Compressed air as required
- HVAC and drainage according to hygiene and local regulations
Turnkey Factory Setup
An investor can start from an empty site. Depending on contractual scope, the project can be accompanied through: Idea → Feasibility → Engineering → Factory Design → Machinery → Procurement → Manufacturing → Installation → Commissioning → Training → Raw Material Supply → Packaging → Trial Production → Commercial Production. The objective is an operational factory ready for production.
EPC & PMC
Projects can be executed under EPC (Engineering, Procurement, Construction) or PMC (Project Management Consultancy) approaches. Engineering, machinery supply or manufacturing, installation supervision and commissioning are coordinated within the defined contract boundaries.
Machinery Repair
Existing halvah factories can request inspection, troubleshooting, mechanical and electrical repair, component replacement, spare-parts supply and line maintenance support for dehullers, mills, cooking kettles, mixers and packaging machines.
Machinery Overhaul & Refurbishment
Older equipment can be evaluated for comprehensive overhaul, replacement of worn stones or discs, control-system upgrades, improved reliability and modest capacity or quality improvements where technically feasible.
Capacity Expansion
Capacity of an existing line can often be increased by addressing bottlenecks, upgrading key machines (mill, kettle, packaging), improving material handling or introducing selective automation.
Industrial Automation
Typical applications include PLC sequence control, temperature monitoring, automatic dosing, HMI, data logging and optional SCADA integration.
Supply Chain
Factory = Machinery + Raw Materials + Utilities + People + Process + Supply Chain + Market. The Supply Chain Department supports supplier sourcing, procurement, logistics and ongoing material supply for halvah projects.
Packaging
Primary packaging, secondary packaging, labeling, coding, cartoning and palletizing are integrated according to product format and market requirements.
Branding & Product Development
When required, support can be provided for product development, packaging design, graphic design, industrial design, branding and related marketing preparation.
Market & Country Sections
Engineering, machinery, installation, overhaul and supply-chain support are available for halvah projects in Iran, Iraq, Kurdistan Region (Erbil, Sulaymaniyah, Duhok), Baghdad, Basra, Mosul, Afghanistan (Kabul, Herat, Mazar-e-Sharif), Uzbekistan, Turkmenistan, Tajikistan, Syria, Oman, Jordan, Turkey, Armenia and Georgia.
Sahi Rasa Services
| Service | Application in This Project |
|---|---|
| Feasibility Study | Technical and economic assessment of capacity, product mix and investment |
| Factory Design | Layout, process flow and utility design |
| Machinery Design / Manufacturing | Specification and coordinated supply or manufacturing of process equipment |
| Procurement | Sourcing of machinery, components and materials |
| Installation & Commissioning | Mechanical/electrical installation, start-up and performance testing |
| Automation | PLC, HMI, process control and optional SCADA |
| Raw Material Supply | Coordination via Supply Chain Department |
| Repair / Overhaul / Refurbishment | Restoration and modernization of existing machinery |
| Capacity Expansion | Engineering and implementation of throughput increases |
| Staff Training | Operational and basic maintenance training |
Why Sahi Rasa
Process engineering, machinery-related capabilities, procurement support, supply-chain coordination, installation, commissioning, training, maintenance support and automation are combined. The practical advantage is a more integrated execution path from concept to an operating production line.
From Empty Land to Production
Typical sequence: Feasibility → Engineering → Factory Design → Equipment Design → Machinery Manufacturing/Procurement → Logistics → Installation → Commissioning → Staff Training → Raw Material Supply → Trial Production → Commercial Production. Operational support for a defined initial period can be examined as a contractual option.
Who Should Contact Sahi Rasa?
- Investors – planning a new sugar and tahini halvah factory or production line
- Existing Factory Owners – needing repair, overhaul, refurbishment, modernization, automation or capacity expansion
- Industrial Buyers – requiring machinery, spare parts, raw materials or engineering services
Final CTA
If you intend to set up a sugar and tahini (ardeh) halvah production line or factory, if your existing plant needs repair, overhaul or capacity expansion, if you require new machinery or automation, or if you need coordination of raw-material supply, contact the Industrial Department.
Submit your request for: Factory Setup / Machinery / Repair / Overhaul / Refurbishment / Automation / Capacity Expansion / Raw Materials.
Registering an order for raw materials for the factory Halva (Sugar and Tahini)
FAQ
- What is the typical cost of setting up a halvah factory?
Cost depends on capacity, product range, automation level, building and utility scope. A detailed estimate is prepared after process definition. - Which main machines are required?
Sesame dehuller, stone or colloidal mill, 60 kg halva cooking kettle, industrial mixer and packaging machine. - What production capacity can be designed?
Capacity is determined during the engineering phase according to market demand and investment criteria. - How much space is needed?
Typical process area ranges from approximately 300 to 600 m², subject to final layout. - What are the main raw materials?
Sesame seeds, sugar, glucose, water, soapwort root extract (optional), saffron, rose water, colors and packaging materials. - Can raw materials be supplied?
Yes, via the Supply Chain Department according to project scope. - Is machinery manufacturing or procurement supported?
Design, manufacturing or coordinated procurement according to the agreed scope. - Can existing machines be repaired?
Yes – inspection, troubleshooting, mechanical/electrical repair and spare parts. - Is overhaul or refurbishment possible?
Yes – comprehensive restoration and control upgrades. - Can capacity of an existing line be increased?
Often yes, by addressing bottlenecks and upgrading key equipment. - Are turnkey projects executed?
Turnkey or partial turnkey scopes can be offered under defined contracts. - Are services available in Iraq and Kurdistan Region?
Yes, including Erbil, Sulaymaniyah, Duhok and other locations. - Are services available in Afghanistan?
Yes, including Kabul, Herat and Mazar-e-Sharif. - Can raw materials be supplied from Iran for regional projects?
Yes, coordination of material supply is part of possible supply-chain scope. - Is installation and commissioning included?
They can be included according to the selected contractual package.