Portfolio
PE Pipe Production Line and Factory Setup
A polyethylene (PE) pipe production line is a complete industrial system designed to extrude PE100, PE80 or PE63 granules into pressure and non-pressure pipes under controlled process conditions. The line produces pipes for water supply, gas distribution, irrigation and industrial applications.
From an industrial perspective, PE pipe manufacturing is important because it combines precise extrusion, vacuum calibration, controlled cooling and accurate cutting to achieve consistent diameter, wall thickness and long-term hydrostatic strength. The process relies on a defined sequence of unit operations that must be correctly engineered, sized and integrated.
Primary materials typically include PE100, PE80 or PE63 granules and colour masterbatch. The core machinery set consists of extruders, die heads, vacuum calibration tanks, cooling tanks, haul-offs, automatic saws and coilers or stackers.
The Industrial Department supports investors who want to establish a new PE pipe factory as well as existing plant owners who need repair, overhaul, capacity expansion or automation of their current lines. Projects can start from an empty site or from an operating facility that requires technical upgrading.
Whether the goal is a green-field turnkey PE pipe plant in Iraq, Kurdistan Region, Afghanistan or other regional markets, or the modernization of an existing line in Iran, engineering, machinery supply or manufacturing, installation, commissioning and ongoing technical support can be provided under defined contractual scopes.
Production Line Overview
The PE pipe line is engineered as an integrated process system covering material preparation, extrusion, vacuum calibration, cooling, haul-off, cutting and coiling or stacking. Design capacity is determined during the engineering phase and can typically range from 150 to 1000 kg per hour depending on diameter and wall thickness.
Typical product specifications include diameters 16–630 mm. Main machinery groups include extruders, die heads, vacuum calibration tanks, cooling tanks, haul-offs, automatic saws and coilers or stackers.
Manpower requirements depend on the degree of automation. Quality control covers diameter, wall thickness, ovality and hydrostatic performance.
Technical Specifications
| Specification | Description |
|---|---|
| Product | PE pipes (PE100, PE80, PE63) |
| Production Capacity | 150–1000 kg/h |
| Required Area | 500–1000 m² |
| Electrical Power | 380 V three-phase, 100–300 kW |
| Water Consumption | 10–20 m³/day |
| Manpower | 5–10 persons per shift |
| Pipe Diameter | 16–630 mm |
| Main Machines | Extruder, die head, vacuum calibration, cooling tank, haul-off, automatic saw, coiler/stacker |
All figures are indicative.
Products
PE pipes for potable water, gas distribution, irrigation and industrial use.
Raw Materials for PE Pipe Factory
Primary materials are PE100, PE80 or PE63 granules and colour masterbatch.
Sahi Rasa For Factories raw material
The Supply Chain Department is prepared to support identification, evaluation and supply of PE granules and masterbatch required by PE pipe factories.
Registering an order for raw materials for the factory PE Pipe
Sahi Rasa Supply Chain Department
Support is available for projects in Iran, Iraq, Kurdistan Region, Afghanistan and other regional markets.
Manufacturing Process
- Material Preparation – PE granules and masterbatch are prepared.
- Extrusion – Material is melted at 180–220 °C and formed into pipe.
- Vacuum Calibration – Outer diameter is set under vacuum.
- Cooling – Pipe is cooled in water tanks.
- Haul-off and Cutting – Pipe is pulled and cut to length.
- Collection – Pipes are coiled or stacked.
Machinery & Equipment
- Extruder – Melts and pumps the PE compound. Position: first stage. Importance: foundation of pipe quality. Quality impact: incomplete melting causes defects. Maintenance: screws, barrels and heaters. Sahi Rasa support covers design, installation, repair and spare parts.
- Die Head and Vacuum Calibration Tank – Forms and sizes the pipe. Position: after extruder. Importance: dimensional accuracy. Quality impact: incorrect vacuum causes ovality. Maintenance: dies, vacuum system and seals.
- Cooling Tank and Haul-off – Stabilizes and pulls the pipe. Position: mid-line. Importance: dimensional stability. Quality impact: uneven cooling affects diameter. Maintenance: water circulation, belts and drives.
- Automatic Saw and Coiler/Stacker – Cuts and collects the pipe. Position: end of line. Importance: length accuracy. Quality impact: inaccurate cutting causes waste. Maintenance: blades, drives and controls.
Factory Layout & Building Requirements
Typical areas include raw-material storage, extrusion hall, calibration and cooling, cutting and collection, finished-pipe storage, quality control, utilities and staff facilities. Exact area is determined during engineering.
Utilities
- Electricity: 380 V three-phase, 100–300 kW
- Water: 10–20 m³/day
Turnkey Factory Setup
An investor can start from an empty site. The project can be accompanied through feasibility, engineering, design, machinery, installation, commissioning, training and commercial production.
EPC & PMC
Projects can be executed under EPC or PMC approaches within defined contracts.
Machinery Repair
Existing PE pipe lines can request inspection, repair and spare-parts support for extruders, calibration systems, haul-offs and saws.
Machinery Overhaul & Refurbishment
Older equipment can be overhauled and control systems upgraded.
Capacity Expansion
Capacity can be increased by upgrading the extruder or adding parallel lines.
Industrial Automation
PLC control of temperature, vacuum, speed and cutting is typical.
Supply Chain
The Supply Chain Department supports PE granule and masterbatch supply.
Packaging
Coils or straight lengths are protected and labelled according to market requirements.
Branding & Product Development
Support for product development and technical documentation is available when required.
Market & Country Sections
Services are available in Iran, Iraq, Kurdistan Region, Afghanistan and other listed regional markets.
Sahi Rasa Services
| Service | Application in This Project |
|---|---|
| Feasibility Study | Technical and economic assessment |
| Factory Design | Layout and process design |
| Machinery Design / Manufacturing | Equipment specification and supply |
| Procurement | Sourcing of machinery and materials |
| Installation & Commissioning | Start-up and testing |
| Automation | PLC and process control |
| Raw Material Supply | Via Supply Chain Department |
| Repair / Overhaul | Restoration of existing equipment |
| Capacity Expansion | Throughput increases |
| Staff Training | Operational training |
Why Sahi Rasa
Integrated process engineering, machinery, installation and training provide a clear path from concept to operating production line.
From Empty Land to Production
Typical sequence from feasibility through commercial production.
Who Should Contact Sahi Rasa?
- Investors planning a new PE pipe factory
- Existing owners needing repair, overhaul or expansion
- Industrial buyers requiring machinery or materials
Final CTA
Contact the Industrial Department for factory setup, machinery, repair, overhaul or raw-material coordination.
Registering an order for raw materials for the factory PE Pipe
FAQ
- What capacity can be designed?
Typically 150–1000 kg/h. - Which main machines are required?
Extruder, die head, vacuum calibration, cooling tank, haul-off, automatic saw and coiler/stacker. - How much space is needed?
Approximately 500–1000 m². - Can existing lines be repaired?
Yes. - Are turnkey projects available?
Yes under defined contracts. - Are services available in Iraq and Afghanistan?
Yes. - Can PE granules be supplied?
Yes via the Supply Chain Department. - Is installation included?
It can be included according to the package. - What about automation?
PLC and process control can be provided. - How is capacity expanded?
By upgrading the extruder or adding parallel lines.